What Your Area's Energy Future Is Projected to Look Like

Every company that runs electricity wires in Great Britain has to guess what will be plugged into them. Heat pumps, electric cars and solar panels all change what a street draws and when, and a network built for the wrong future is either overloaded or overbuilt. So each network operator publishes a set of Distribution Future Energy Scenarios: several different versions of the next twenty-five years, modelled down to individual council areas.

This page shows them council by council, for the places a network covers well enough that a figure is about the place rather than about the wires. It answers a question no measured statistic can: not how many heat pumps are here, but how many are expected to be.

Each council is answered by exactly one network operator, and that operator is named beside every figure. Operators publish different measures under similar names and model their own networks on their own assumptions, so nothing here is added up across them or compared between them.

Choose a council area

The list holds only the councils an operator serves almost entirely. Others appear in the published releases and are deliberately absent here; they are named further down, with the share of homes each operator actually reaches.

Several futures, not one forecast

The pathways are the national Future Energy Scenarios, adopted by each network operator and modelled down to its own wires: Holistic Transition, Electric Engagement and Hydrogen Evolution. All three reach net zero by 2050 and they differ mainly in how homes end up being heated — a mostly electrified route, a strongly electrified one, and one where hydrogen takes a share of home heating — and by 2050 that produces genuinely different networks. Some operators add a pathway of their own on top of those three; the columns of each table are exactly the pathways that operator publishes, named in full.

There is no central case here and we do not calculate one. Every figure below is labelled with the pathway it belongs to, in the column header it sits under and again beside the chart. Averaging divergent futures produces one that nobody modelled and that describes no scenario the operator is planning for. Where the pathways agree, they are still shown separately.

One thing to expect before you read the tables: the pathways carry identical numbers for the first decade of each edition and separate only afterwards. That is a property of the modelling — one shared near-term trajectory — and not a sign that the next ten years are settled. The year they separate is printed under each table and is read off the figures rather than written down here.

All domestic heat pumps

Projection, not measurement

All domestic heat pumps projected in Leeds

Northern Powergrid · NPgN+NPgY · Northern Powergrid DFES - 2026 Draft · published as a draft

This council sits across two of Northern Powergrid’s licence areas, so the figures below span both.

Full electric and hybrid heat pumps together, as Northern Powergrid publishes them. This is the publisher’s own total, not our addition: the two parts are published separately as well and come close to it without re-adding to it exactly, so the three figures must never be added to one another and the small difference between them is not a fourth category.

  • Electric Engagement

    273,603

    in 2050, under Electric Engagement

  • Holistic Transition

    298,002

    in 2050, under Holistic Transition

  • Hydrogen Evolution

    196,530

    in 2050, under Hydrogen Evolution

Electric EngagementHolistic TransitionHydrogen Evolution2025 to 2050
All domestic heat pumps projected in Leeds, by scenario and year. Every column is one named pathway.
YearElectric EngagementHolistic TransitionHydrogen Evolution
20252,5172,5172,517
203015,92415,92415,924
203574,06274,06274,062
2040136,646145,916113,429
2045212,651231,307160,360
2050273,603298,002196,530

The three pathways carry identical figures until 2036, and differ from 2036 onwards. That is one near-term trajectory the scenarios were built on, not agreement that the next decade is settled — which is why the earlier rows still name the pathway they belong to.

Leeds · Northern Powergrid serves about 94% of the homes in this authority

Electric cars and vans

Projection, not measurement

Electric cars and vans projected in Leeds

Northern Powergrid · NPgN+NPgY · Northern Powergrid DFES - 2026 Draft · published as a draft

This council sits across two of Northern Powergrid’s licence areas, so the figures below span both.

Hybrid and full electric cars and vans together, including commercial vans. Not a count of household vehicles. Electric lorries and buses are counted separately by the operator and are not included here.

  • Electric Engagement

    422,812 vehicles

    in 2050, under Electric Engagement

  • Holistic Transition

    400,029 vehicles

    in 2050, under Holistic Transition

  • Hydrogen Evolution

    445,540 vehicles

    in 2050, under Hydrogen Evolution

Electric EngagementHolistic TransitionHydrogen Evolution2025 to 2050
Electric cars and vans projected in Leeds, by scenario and year. Every column is one named pathway.
YearElectric EngagementHolistic TransitionHydrogen Evolution
202523,239 vehicles23,239 vehicles23,239 vehicles
2030128,249 vehicles128,249 vehicles128,249 vehicles
2035268,072 vehicles268,072 vehicles268,072 vehicles
2040371,663 vehicles371,610 vehicles371,657 vehicles
2045411,410 vehicles397,020 vehicles425,734 vehicles
2050422,812 vehicles400,029 vehicles445,540 vehicles

The three pathways carry identical figures until 2036, and differ from 2036 onwards. That is one near-term trajectory the scenarios were built on, not agreement that the next decade is settled — which is why the earlier rows still name the pathway they belong to.

Leeds · Northern Powergrid serves about 94% of the homes in this authority

Domestic solar capacity

Projection, not measurement

Domestic solar capacity projected in Leeds

Northern Powergrid · NPgN+NPgY · Northern Powergrid DFES - 2026 Draft · published as a draft

This council sits across two of Northern Powergrid’s licence areas, so the figures below span both.

Installed domestic solar capacity in megawatts, across every system size. Not a count of installations — the publisher gives none anywhere in the release.

  • Electric Engagement

    266.5 MW

    in 2050, under Electric Engagement

  • Holistic Transition

    262.5 MW

    in 2050, under Holistic Transition

  • Hydrogen Evolution

    122.1 MW

    in 2050, under Hydrogen Evolution

Electric EngagementHolistic TransitionHydrogen Evolution2025 to 2050
Domestic solar capacity projected in Leeds, by scenario and year. Every column is one named pathway.
YearElectric EngagementHolistic TransitionHydrogen Evolution
202537.5 MW37.5 MW37.5 MW
203064.4 MW64.4 MW64.4 MW
2035102.4 MW102.4 MW102.4 MW
2040152.8 MW148.8 MW110.1 MW
2045208.4 MW204.5 MW115.6 MW
2050266.5 MW262.5 MW122.1 MW

The three pathways carry identical figures until 2036, and differ from 2036 onwards. That is one near-term trajectory the scenarios were built on, not agreement that the next decade is settled — which is why the earlier rows still name the pathway they belong to.

Leeds · Northern Powergrid serves about 94% of the homes in this authority

None of this has happened yet

Everything above is modelled. It is worth saying plainly because the figures look exactly like the measured ones elsewhere on this site: the same units, the same council names, the same tables.

The measured picture for these same areas — consumption, how homes are heated, EPC bands, and the solar, heat pumps and chargers already connected to the network — is on energy use in your area, and grant-funded installations are on solar and heat pump deployment. We keep them on separate pages on purpose. A modelled 2050 figure and a counted 2024 one on one axis would draw a line between them, and that line would not be a trend: the two are built on different definitions, different counting bases and different vintages.

Which network covers which councils

Great Britain has six distribution network operators, and each publishes its own scenarios on its own assumptions and its own measures. This page holds 5 of them. Nothing here can be added up into a British projection or compared like for like between operators — not because the arithmetic is hard, but because the quantities are different quantities.

Within a release, a council’s row covers only the part of that council the network actually reaches. Where that is nearly all of it, the council is in the list above. Where it is a fraction, a projection printed beside the name would describe the wires rather than the place, and it is named below instead.

Licence areas cross council boundaries, so a council can genuinely be served by more than one network. Where that happens each operator has modelled only its own part, and neither part is the council. This page answers such a council with one operator — the one covering the larger share of it — names the others beside the figures with the shares they cover, and never adds them together. Two slices of one council are guaranteed neither to be separate from each other nor to be the whole of it, so their sum would be a number for no area at all.

Councils in the releases that are not shown

Each of these appears in an operator’s published release, and in each case the row describes only the part of the council that operator’s wires reach rather than the council. A projection printed beside the name would be a true statement about the network and a false one about the place, so the figures are held rather than shown. They are held for two different reasons, and the difference matters.

Northern Powergrid9 councils where the network reaches less than 80% of the homes

  • Bassetlawabout 13% of homes served
  • Derbyshire Dalesabout 0% of homes served
  • East Lindseyabout 22% of homes served
  • High Peakabout 4% of homes served
  • North East Derbyshireabout 20% of homes served
  • Pendleabout 17% of homes served
  • Ribble Valleyabout 0% of homes served
  • Rochdaleabout 0% of homes served
  • West Lindseyabout 63% of homes served

UK Power Networks14 councils where the network reaches less than 80% of the homes

  • Arunabout 40% of homes served
  • Buckinghamshireabout 42% of homes served
  • Cherwellabout 0% of homes served
  • Ealingabout 2% of homes served
  • Hillingdonabout 30% of homes served
  • Hounslowabout 0% of homes served
  • Milton Keynesabout 0% of homes served
  • North Northamptonshireabout 0% of homes served
  • Runnymedeabout 55% of homes served
  • South Hollandabout 0% of homes served
  • South Oxfordshireabout 12% of homes served
  • Spelthorneabout 18% of homes served
  • Surrey Heathabout 4% of homes served
  • Waverleyabout 19% of homes served

UK Power Networks1 council where how much of the council the network reaches cannot be established

UK Power Networks bounds its other councils but not this one: there is no published count of homes to measure its share of it against. That is not the same as saying the share is small — it is unknown. It is held rather than shown because the rest of this operator’s release is measured: every other council UK Power Networks serves is in the list above with the share it covers stated, so a figure here with no share beside it would be the only one on the page a reader had no way to place.

  • Chichestershare not published

Electricity North West10 councils where the network reaches less than 80% of the homes

  • Cheshire Eastabout 29% of homes served
  • High Peakabout 74% of homes served
  • Pendleabout 73% of homes served
  • Ribble Valleyabout 70% of homes served
  • Salfordabout 78% of homes served
  • Seftonabout 0% of homes served
  • St. Helensabout 22% of homes served
  • Warringtonabout 10% of homes served
  • West Lancashireabout 71% of homes served
  • Wyreabout 75% of homes served

Electricity North West3 councils where how much of the council the network reaches cannot be established

Electricity North West bounds its other councils but not these: there is no published count of homes to measure its share of them against. That is not the same as saying the share is small — it is unknown. It is held rather than shown because the rest of this operator’s release is measured: every other council Electricity North West serves is in the list above with the share it covers stated, so a figure here with no share beside it would be the only one on the page a reader had no way to place.

  • Derbyshire Dalesshare not published
  • Northumberlandshare not published
  • Staffordshire Moorlandsshare not published

National Grid Electricity Distribution25 councils where the network reaches less than 95% of the homes

  • Bassetlawabout 88% of homes served
  • Bedfordabout 16% of homes served
  • Buckinghamshireabout 17% of homes served
  • Central Bedfordshireabout 0% of homes served
  • Ceredigionabout 65% of homes served
  • Cherwellabout 41% of homes served
  • Cheshire Eastabout 4% of homes served
  • Cotswoldabout 43% of homes served
  • Doncasterabout 1% of homes served
  • Dorsetabout 11% of homes served
  • East Lindseyabout 65% of homes served
  • Fenlandabout 1% of homes served
  • High Peakabout 6% of homes served
  • Huntingdonshireabout 0% of homes served
  • King's Lynn and West Norfolkabout 0% of homes served
  • North East Derbyshireabout 90% of homes served
  • North Lincolnshireabout 0% of homes served
  • Peterboroughabout 27% of homes served
  • Powysabout 57% of homes served
  • Rotherhamabout 0% of homes served
  • Shropshireabout 76% of homes served
  • Somersetabout 82% of homes served
  • West Lindseyabout 28% of homes served
  • West Oxfordshireabout 1% of homes served
  • Wiltshireabout 0% of homes served

National Grid Electricity Distribution1 council where how much of the council the network reaches cannot be established

National Grid Electricity Distribution bounds its other councils but not this one: there is no published count of homes to measure its share of it against. That is not the same as saying the share is small — it is unknown. It is held rather than shown because the rest of this operator’s release is measured: every other council National Grid Electricity Distribution serves is in the list above with the share it covers stated, so a figure here with no share beside it would be the only one on the page a reader had no way to place.

  • Sheffieldshare not published

Places these releases do not cover at all

These council areas are inside a network an operator publishes for, and the operator publishes no figures for them. That is a gap in the release rather than a decision of ours, and it is named here so a reader looking for one of them is told why there is nothing rather than left to guess.

  • Allerdale Abolished in April 2023 and replaced by Cumberland, which covers a different area. Electricity North West still publishes projections under the old name, and attributing them to Cumberland would put a figure on a boundary nobody modelled. (Electricity North West)
  • Barrow-in-Furness Abolished in April 2023 and replaced by Westmorland and Furness, which covers a different area. (Electricity North West)
  • Carlisle Abolished in April 2023 and replaced by Cumberland, which covers a different area. (Electricity North West)
  • Copeland Abolished in April 2023 and replaced by Cumberland, which covers a different area. (Electricity North West)
  • Craven Abolished in April 2023 and absorbed into the North Yorkshire unitary authority, which covers a far larger area. (Electricity North West)
  • Eden Abolished in April 2023 and replaced by Westmorland and Furness, which covers a different area. (Electricity North West)
  • Richmondshire Abolished in April 2023 and absorbed into the North Yorkshire unitary authority, which covers a far larger area. (Electricity North West)
  • South Lakeland Abolished in April 2023 and replaced by Westmorland and Furness, which covers a different area. (Electricity North West)

Where these projections come from

Distribution Future Energy Scenarios are published annually by each network operator and revised as the modelling changes, so a figure here can move without anything happening in the world. Each operator’s licence, attribution and edition are its own and are printed with its own figures below — Northern Powergrid answers for Leeds.

Where these projections come from

  • These are scenarios, not forecasts. The network operator publishes several divergent futures on purpose and every figure here belongs to exactly one of them.
  • A projection is not a measurement. Nothing here may be charted or compared against the measured heat-pump and electric-vehicle deployment this site holds for the same areas.

Northern Powergrid · Northern Powergrid DFES - 2026 Draft

Licence: Northern Powergrid Open Data Licence v1.0 · this edition is published as a draft, and its own title says so

  • Northern Powergrid publishes this edition as a draft, and its own title says so.
  • These rows are a hierarchy. A total and the components beneath it must not be added together.
  • The electric vehicle count includes commercial vans. It is not a count of household vehicles.
  • Solar and battery figures are installed capacity in megawatts. They are not a count of installations, and the publisher gives no count.

Supported by Northern Powergrid Open Data

Frequently asked questions

Which of the scenarios is the one that will happen?

None of them is a prediction, and we deliberately do not present one as the likeliest. Network operators publish several divergent futures on purpose, because the point of the exercise is to size the network for a range rather than to guess a single outcome. Every figure on this page therefore carries the name of the pathway it belongs to, and we do not calculate an average, a midpoint or a central case across them — a number in the middle of three futures is not a fourth, more likely future.

What is Falling Behind, and why is it not one of the pathways?

It is a counterfactual rather than a pathway: a version of the future in which the country misses net zero, modelled so that a network can be tested against it. The national scenarios these are built on are three routes to net zero plus that counterfactual, which was called Counterfactual in the 2024 edition and renamed Falling Behind in 2025. We name it where the operator publishes it and never chart it beside the others, because a counterfactual is not one end of a range of futures. Some operators publish it and some do not; an operator that does not is making a publishing choice rather than leaving a gap.

Why do the scenarios show identical numbers for the first decade?

Because the modelling uses one near-term trajectory that all the pathways share, and only lets them separate later. That is true of every measure and every council area in these releases. It does not mean the next decade is settled — it means the differences the scenarios were built to explore are long-term ones, so the early figures are still a projection under a named pathway rather than a fact. The year each set of pathways separates is read off the data and printed under the table.

Why is my council not on the list?

Either no operator that publishes these scenarios covers it yet — there are six distribution network operators in Great Britain and this page holds the ones whose releases we have read — or the network reaches too little of it for a figure to mean anything about the place. Councils in the second group are named further down with the share of homes the operator actually serves. Rochdale, for instance, has 16 connections on Northern Powergrid’s network against nearly a hundred thousand homes, so “16 heat pumps expected in Rochdale” would be a true statement about the network and a wildly false one about Rochdale.

Can I add two operators’ figures together for one area?

No, and neither do we. Where two operators both publish a council, each is describing the part of it its own wires reach, and neither slice is guaranteed to be separate from the other or to be the whole place. Adding them could double-count or undercount and there is no way to tell which. So every council on this page is answered by exactly one operator, and the operator is named beside the figures.

Is this a national projection for Great Britain?

No. It covers the network operators whose releases are on this page, and only the councils each of them serves almost entirely. Every operator produces its own Distribution Future Energy Scenarios on its own assumptions and its own measures, so these numbers cannot be added up into a British total or compared like for like between operators.

Do the electric vehicle figures mean the same thing for every operator?

No, and the difference is easy to miss. Northern Powergrid counts electric cars and vans together, including commercial vans; UK Power Networks counts cars only. Neither figure is a count of household vehicles and the two are not comparable with one another. Each panel says which it is, in the sentence under its heading, because the numbers themselves look identical in kind.

Why does the heat pump figure mean something different in different places?

Because the operators publish different things under near-identical names. Northern Powergrid publishes one total covering full electric and hybrid heat pumps together. UK Power Networks publishes full electric heat pumps and hybrid heat pumps as two separate figures that do not overlap, and publishes no total at all — so where its network covers your council you will see the two separately, and we do not add them into a total the operator never published. We do not put the two operators’ heat pump figures on one axis anywhere.

Why is solar shown in megawatts rather than as a number of homes?

Because that is what is published. Operators give installed domestic solar capacity in megawatts and give no count of installations anywhere in these releases, and dividing by an assumed system size to manufacture a number of homes would be our arithmetic presented as their data. The same applies to domestic battery storage.

Can I compare these projections with the heat pumps already installed?

Carefully, and not on one chart. We hold measured installation and connection figures for these same areas, on the area energy use page, and they answer a different question: what has happened rather than what is modelled to happen. The two use different definitions, different counting bases and different vintages, so a modelled 2050 figure and a counted 2024 one on the same axis would look like a trend and would not be one. That is why they sit on separate pages here.

How often do these projections change?

Annually. Network operators revise their Distribution Future Energy Scenarios each year, so the numbers move with the modelling as well as with the world. The edition each figure comes from is named beside the figures and again at the foot of the page, and where an operator publishes an edition as a draft, we say so.

Related reading

Rob Gibbs

Written by

Rob Gibbs

Hi, I'm Rob, and I run Energy-Review.co.uk. I initially started this project in 2018 when I was looking to switch energy suppliers and found there wasn't a website that provided simple, data-backed reviews on all the suppliers available. Since then, I have spent a lot of time (too much, some may say!) looking at all publicly available data about each supplier and writing reviews using this information. These reviews are updated as regularly as possible, and any data is backed up by a source where necessary. I have also started writing guides on various energy-related topics, which hopefully you will find useful. If you find any issues, please use our contact form to let us know.