UK Public EV Charging Data
Public charging provision is the single most quoted statistic in the electric car debate, and one of the most slippery. The Department for Transport publishes it monthly for Great Britain and quarterly for every local authority and constituency.
The figures are good. What people do with them often is not, because the headline count answers a narrower question than it appears to.
What actually gets counted
DfT counts charging devices at publicly available locations. Three things follow from that definition, and all three affect how the number should be read.
- A device is not a connector. Many devices can serve two cars, so the count is not the number of vehicles that can charge at once — it understates that.
- Publicly available means what it says. Chargers in private car parks, at workplaces or on driveways are excluded, and those are where the large majority of charging actually happens.
- A device counted is not a device working. The statistics record provision, not reliability. A broken charger counts the same as a working one.
Public charging across Great Britain
National figures are monthly; the area breakdowns are quarterly and published on a different cycle, so the two are shown separately rather than as one series.
Great Britain · October 2026
123,546 public charging devices
50kW and above
29,354
23.8% of public chargers
Chargers per 100,000 people
183.4
Uses ONS mid-2024 population estimates
50kW+ per 100,000 people
43.6
DfT calls these rapid and ultra-rapid chargers
Change since January 2025
+21.4%
Based on the comparable monthly GB series
Monthly public charging
The latest 12 published months
Operational at 00:00 on each reporting date
| Month | All chargers | 50kW+ | Per 100,000 |
|---|---|---|---|
| October 2026 | 123,546 | 29,354 | 183.4 |
| September 2026 | 122,502 | 29,163 | 181.9 |
| August 2026 | 121,573 | 28,884 | 180.5 |
| July 2026correction | 120,015 | 28,515 | 178.2 |
| June 2026 | 120,109 | 28,006 | 178.3 |
| May 2026 | 119,253 | 27,734 | 177.1 |
| April 2026 | 117,935 | 27,017 | 175.1 |
| March 2026 | 117,171 | 26,655 | 174 |
| February 2026 | 115,703 | 26,238 | 171.8 |
| January 2026 | 114,944 | 26,056 | 170.7 |
| December 2025 | 114,902 | 26,426 | 170.6 |
| November 2025 | 113,971 | 25,694 | 169.2 |
Country and English region comparison
Public charging relative to population
Ranked by all public chargers per 100,000 people. Country totals and England's regions overlap, so do not add the rows together.
| Area | Chargers | Per 100,000 | 50kW+ per 100,000 |
|---|---|---|---|
| Londonregion | 31,888 | 350.8 | 29 |
| Scotlandcountry | 13,064 | 235.5 | 62 |
| Walescountry | 6,201 | 194.6 | 44.2 |
| Englandcountry | 104,281 | 177.9 | 41.8 |
| South Eastregion | 16,599 | 172.1 | 40.2 |
| West Midlandsregion | 10,327 | 166.9 | 48 |
| South Westregion | 9,321 | 158.3 | 49.8 |
| East of Englandregion | 10,262 | 156 | 49.1 |
| North Eastregion | 4,245 | 153.8 | 39.2 |
| East Midlandsregion | 6,339 | 125.2 | 48.5 |
| North Westregion | 8,902 | 115.1 | 41 |
| Yorkshire and The Humberregion | 6,398 | 112.8 | 37.8 |
Charging in your area
Provision varies enormously between neighbouring authorities. Enter a postcode to see your local authority and constituency. We use it only to find your area and do not save it.
Public charging near you
Find both official areas from one postcode
A postcode identifies your local authority and Westminster constituency without retaining or placing the postcode in the page URL.
Enter a postcode to show both areas, or choose either area manually.
Why the rapid figure matters more
DfT reports chargers of 50kW and above separately as rapid or ultra-rapid, the bands intended for short stays and en-route charging.
The distinction is practical rather than a promise of charging speed. DfT describes lower-power chargers as suited to longer stays during the day or overnight, while rapid and ultra-rapid chargers are intended for shorter stops. The power band is the charger’s maximum potential: the vehicle, its battery management, local load management and the grid can all reduce what is delivered.
A local authority with many devices but few rapid ones has solved a different problem from one with the reverse. The totals alone will not tell you which.
The devices-per-head trap
DfT publishes a chargers-per-100,000-population rate, and it is the fairest simple comparison available — but it has a flaw worth knowing.
Charge points are used by whoever drives past, not only by residents. A rural authority on a trunk road may host chargers serving people who live elsewhere entirely, and score well per head as a result. A dense urban authority with high demand from residents without driveways may score badly while genuinely needing far more. The rate is a useful comparison, not a measure of adequacy.
The other thing per-head figures cannot see is where a charger sits. Provision concentrated in one town centre reads identically to the same number spread evenly across an authority, and those are very different experiences for a driver.
Most charging does not happen here at all
It is worth ending on the thing these statistics deliberately exclude. For a household with off-street parking, the overwhelming majority of charging happens at home overnight, and never appears in any figure on this page.
That matters for cost as much as convenience. The Government’s current advisory rates distinguish home and public charging because public charging costs more per mile on the published basis. Public charging is also standard-rated for VAT, while qualifying domestic electricity is charged at the 5% reduced rate.
Which is why the public figures matter most for the households that cannot do it: no driveway means depending on the provision counted above. If you can charge at home, a working smart meter and a tariff that prices by time of day do more for your running costs than anything else. Several tariffs are built specifically around charging overnight — Intelligent Octopus Go, Octopus Go and EDF Go Electric — and each page carries the live rates for your region rather than a headline figure. The Octopus Agile review covers half-hourly pricing as an alternative approach, and typical household energy use shows what a car adds to a home’s consumption.
Frequently asked questions
How many public EV charge points are there in the UK?
The Department for Transport publishes the total monthly for Great Britain and quarterly by local authority and constituency. The figure counts charging devices, and a single device may have more than one connector, so it is not a count of cars that can charge at once.
What counts as a rapid charger?
DfT reports chargers rated at 50kW and above separately as rapid or ultra-rapid. These are intended for short stays and en-route charging; lower-power chargers suit longer stays such as daytime or overnight parking.
Which parts of the UK have the most charge points?
London is consistently well ahead of everywhere else on devices per head, partly because of dense on-street provision for households without driveways. Beyond that, provision follows local authority ambition as much as population, which is why neighbouring areas can differ sharply.
Do I need a home charger to own an electric car?
No, but it changes the economics substantially. Charging at home overnight on an off-peak tariff is far cheaper per mile than public rapid charging, which carries the higher VAT rate as well as a higher unit price. Households without off-street parking rely on public provision, which is why the local figures matter.
Why does public charging cost more than charging at home?
Two reasons. The electricity itself is bought commercially and the operator has installation, maintenance and payment costs to recover. On top of that, public charging is charged VAT at the standard 20% rate while domestic electricity is charged at 5%.