Renewable Energy Projects in Great Britain
Every renewable electricity project in Great Britain above the reporting threshold appears in one government database — from a scheme somebody sketched and abandoned to the wind farm generating down the road. It is unusually complete, and unusually easy to misread.
The trap is simple: the database is a record of applications, not of things that exist. Counting everything in it as capacity Britain has, or is about to have, overstates reality substantially.
What the planning database records
The Renewable Energy Planning Database tracks each project through the planning system: who is proposing it, what technology, how large, where, and what stage it has reached. Entries stay in the database after they are refused, withdrawn or abandoned, which is what makes it useful for seeing the whole pipeline rather than only the successes.
It covers Great Britain — England, Scotland and Wales. Northern Ireland runs a separate planning system and is not included here.
Projects across Great Britain
Grouped by status and technology. Read the status labels carefully: they are doing most of the work.
Great Britain · July 2026
14,123 projects across the planning pipeline and operating fleet
The total includes live, unsuccessful and historic projects. Use the status cards to distinguish what is operating, being built or still in planning.
Operational
3,012
57,113.4 MW known capacity
Under construction
452
27,901.2 MW known capacity
Awaiting construction
5,779
145,362 MW known capacity
Application submitted
1,431
93,813.5 MW known capacity
England
232,055.4 MW known
10,564
Scotland
138,926.6 MW known
2,715
Wales
21,043.1 MW known
844
Known capacity across every status is 392,025.1 MW. 1,267 projects do not publish a capacity and are excluded from capacity sums.
Technology mix
What is in the database
Project counts and known power capacity cover every development status, including refused, withdrawn, expired and decommissioned projects.
| Technology | Projects | With capacity | Known capacity |
|---|---|---|---|
| Battery storage | 2,629 | 2,050 | 145,553.5 MW |
| Offshore wind | 110 | 109 | 80,535.4 MW |
| Solar photovoltaics | 7,396 | 6,917 | 67,713.9 MW |
| Onshore wind | 2,367 | 2,314 | 58,138 MW |
| Pumped-storage hydro | 19 | 19 | 14,368.1 MW |
| Dedicated biomass | 280 | 268 | 9,652.4 MW |
| Energy from waste | 208 | 197 | 4,820.4 MW |
| Hydrogen | 70 | 46 | 4,435.4 MW |
| Advanced conversion | 125 | 123 | 1,843.4 MW |
| Biomass co-firing | 4 | 4 | 868 MW |
| Landfill gas | 291 | 291 | 837.3 MW |
| Anaerobic digestion | 362 | 276 | 737.5 MW |
| Tidal stream | 29 | 29 | 667 MW |
| Large hydro | 32 | 30 | 557.8 MW |
| Flywheels | 1 | 1 | 400 MW |
| Tidal lagoon | 1 | 1 | 320 MW |
| Small hydro | 157 | 149 | 240.5 MW |
| Shoreline wave | 8 | 8 | 109 MW |
| Liquid-air storage | 4 | 4 | 105.2 MW |
| Geothermal | 7 | 2 | 52 MW |
| Sewage-sludge digestion | 12 | 12 | 50.2 MW |
| Hot dry rocks | 1 | 1 | 7 MW |
| Compressed-air storage | 2 | 1 | 5 MW |
| Unknown technology | 3 | 1 | 4 MW |
| Hydrogen fuel cell | 3 | 2 | 2.1 MW |
| Air-source heat pumps | 2 | 1 | 2 MW |
Battery-storage capacity is power in MW, not stored energy in MWh. REPD does not provide a consistent storage-duration field.
Planning position
Every recorded development status
| Status | Projects | Known capacity |
|---|---|---|
| Awaiting construction | 5,779 | 145,362 MW |
| Operational | 3,012 | 57,113.4 MW |
| Application submitted | 1,431 | 93,813.5 MW |
| Application refused | 916 | 18,970.7 MW |
| Revised application | 812 | 16,410.8 MW |
| Application withdrawn | 631 | 12,927.6 MW |
| Under construction | 452 | 27,901.2 MW |
| Abandoned | 379 | 7,739.3 MW |
| Planning permission expired | 317 | 4,495.3 MW |
| Appeal refused | 301 | 5,251.9 MW |
| Appeal withdrawn | 41 | 766.3 MW |
| Decommissioned | 31 | 858 MW |
| No application required | 15 | 62.6 MW |
| Appeal lodged | 6 | 352.4 MW |
Largest active projects
The biggest known capacities at each live stage
Application submitted
Marram
Offshore wind · Scotland · 19 Jan 2026
3,000 MW
Glen Earrach Pumped Storage Hydro
Pumped-storage hydro · Scotland · 31 Mar 2025
2,000 MW
Machair
Offshore wind · Scotland · 25 Jun 2026
2,000 MW
Bellrock
Offshore wind · Scotland · 2 Apr 2026
1,800 MW
Fearna Pumped Storage Hydro Scheme - Hydro Project
Pumped-storage hydro · Scotland · 2 Mar 2025
1,800 MW
Balliemeanoch Pumped Hydro Project
Pumped-storage hydro · Scotland · 4 Jul 2024
1,500 MW
Morven North Offshore Wind Farm
Offshore wind · Offshore · 20 May 2026
1,450 MW
Morven South Offshore Wind Farm
Offshore wind · Offshore · 20 May 2026
1,450 MW
Awaiting construction
Berwick Bank Offshore Wind Farm
Offshore wind · Offshore · 31 Jul 2025
4,100 MW
Ossian
Offshore wind · Scotland · 10 Jun 2025
3,600 MW
The Kintore Hydrogen Project, Kintore - Hydrogen Plant
Hydrogen · Scotland · 24 Jun 2025
3,000 MW
Hornsea 4
Offshore wind · Offshore · 12 Jul 2023
2,400 MW
West of Orkney Wind Farm
Offshore wind · Offshore · 27 Jun 2025
2,000 MW
Moy Lodge, Tulloch - Earba Pumped Storage Hydro
Pumped-storage hydro · Scotland · 28 Mar 2025
1,800 MW
Coire Glas
Pumped-storage hydro · Scotland · 15 Oct 2020
1,500 MW
Dogger Bank South West
Offshore wind · Offshore · 14 May 2026
1,500 MW
Under construction
Hornsea 3
Offshore wind · Offshore · 1 Apr 2025
2,955 MW
Dogger Bank A & B (was Creyke Beck A & B)
Offshore wind · Offshore · 1 Jul 2021
2,400 MW
The East Anglia Array - Norfolk Boreas
Offshore wind · Offshore · 1 Aug 2025
1,400 MW
Sofia (Teesside B)
Offshore wind · Offshore · 1 Mar 2022
1,400 MW
East Anglia 3 (EA 3)
Offshore wind · Offshore · 1 Jun 2025
1,400 MW
Dogger Bank C (was Teesside A)
Offshore wind · Offshore · 1 Mar 2022
1,200 MW
Inch Cape
Offshore wind · Offshore · 16 Jun 2025
1,080 MW
Coalburn II Energy Storage Facility - Battery Storage Facility
Battery storage · Scotland · 1 Jan 2025
1,000 MW
Operational
Dinorwig
Pumped-storage hydro · Wales · 1 Jan 1983
1,728 MW
Hornsea 2 - Optimus and Breesea
Offshore wind · Offshore · 31 Aug 2022
1,320 MW
Hornsea 1 - Heron & Njord
Offshore wind · Offshore · 1 Dec 2019
1,218 MW
Seagreen
Offshore wind · Offshore · 16 Oct 2023
1,075 MW
Moray East
Offshore wind · Offshore · 1 Apr 2022
950 MW
Moray West Offshore Wind Farm Project
Offshore wind · Offshore · 1 Apr 2025
882 MW
Triton Knoll
Offshore wind · Offshore · 13 Jan 2022
857 MW
East Anglia 1 (EA 1)
Offshore wind · Offshore · 28 Jul 2020
714 MW
Official source and licence
Department for Energy Security and Net Zero — Renewable Energy Planning Database: July 2026 · Great Britain renewable electricity projects over 150kW
Contains public sector information licensed under the Open Government Licence v3.0. Source: DESNZ Renewable Energy Planning Database, managed by Barbour ABI. © Crown copyright 2026.
What is planned near you
Projects are recorded against the local planning authority that decides them. Enter a postcode to find yours — it is resolved to an authority code and is never stored, logged or placed in the URL.
Renewable projects near you
Find your local planning picture
Use a postcode to identify your local authority without retaining it, or choose an area manually. Results group projects by technology and current development status.
Enter a postcode or choose a local authority to see its technology mix, planning status and largest active projects.
Status is everything
Every project carries a planning status, and the difference between them is the difference between a press release and a power station.
- Application submitted — somebody has asked. Many never get further.
- Awaiting construction — consented but not started. Real permission, no concrete.
- Under construction — being built now, and the strongest signal in the database.
- Operational — generating.
- Refused, withdrawn, abandoned — did not happen, and retained deliberately so the pipeline is honest about attrition.
Add every megawatt in the database together and you get a number far larger than anything Britain will build, because it includes refused schemes, abandoned ones and duplicates at different stages. The summaries above keep the statuses apart for that reason.
What the capacities actually mean
Capacity is quoted in megawatts, and a megawatt of one technology is not a megawatt of another. This is the second most common way to misread the database after status.
A megawatt is the maximum a project can produce at full output. What it delivers over a year is that figure multiplied by how much of the time it actually runs — the capacity factor. Offshore wind in British waters typically runs at roughly two-fifths of its rating averaged across the year; onshore wind rather less; solar in this country less again, because half of every day is dark and much of the rest is cloudy.
So a 50 MW solar farm and a 50 MW offshore wind farm are not equivalent additions to the system, and neither is comparable to 50 MW of gas that can run whenever it is asked to. When comparing entries here, compare like with like, and treat any conversion into “homes powered” with suspicion — that figure depends entirely on the capacity factor and the household consumption assumed, and both are usually chosen to flatter.
The other thing capacity does not tell you is physical footprint. Solar needs far more land per megawatt than wind does, while a wind turbine is far more visible from a distance. Two projects with the same number against them can affect an area in completely different ways. Our power stations page shows the same units for plant that is already running, which is a useful sense check on scale.
Why consented projects do not get built
The gap between “awaiting construction” and “operational” is where most of the interesting failure happens, and planning permission is rarely the reason.
The most common obstacle is the grid. A project needs a connection agreement before it can export anything, and the queue for one has run into years — long enough that some consented schemes expire waiting. That queue is visible on the grid connection queue page, and reading it alongside this one gives a much better sense of what is genuinely coming.
Beyond that: finance has to be arranged in a market where costs have moved; supply chains for turbines and transformers are long; and for many schemes the economics depend on securing a government contract for the electricity, which is competitive and not guaranteed.
If something is proposed near you
Renewable schemes go through the same planning process as any other development, and the consultation is genuinely open — anyone can comment, not only immediate neighbours.
Two practical points. Comments carry more weight when they engage with planning considerations — landscape impact, noise, traffic during construction, ecology — than with whether renewable energy is a good idea in general. And larger schemes above a size threshold are decided nationally rather than by the local council, which changes who you write to and the timetable you are working to.
If what you actually want is to know what is already generating rather than what is proposed, the power stations page lists the operating fleet, and live electricity shows what wind and solar are contributing at this moment.
How to interpret the database
A quarterly snapshot records known project status at publication time. It is not a generation forecast or a guarantee that consented capacity will be built.
Project coverage is generally above 150kW today; before 2021 the database threshold was 1MW. Small rooftop systems are therefore not a complete series here.
Local matching uses an exact planning-authority name match. Nationally consented, offshore and historic-authority projects can be absent from local results while remaining in GB totals.
Northern Ireland is excluded from every consumer figure on this page. Capacity totals omit projects where capacity is not published.
Frequently asked questions
How do I find out what renewable projects are planned near me?
The Renewable Energy Planning Database records every renewable electricity project above the reporting threshold, with its planning status and local authority. Enter a postcode on this page and it resolves to a local authority without the postcode being stored.
Does a project in the database mean it will be built?
No, and this is the most important caveat. The database records applications at every stage, including those refused, withdrawn and abandoned. Even full planning permission does not guarantee construction — grid connection, finance and supply chains all still have to line up.
What does "awaiting construction" mean?
It means the project has planning permission but has not started being built. Some of these proceed, some wait years for a grid connection, and some are never built at all. It is a real milestone but not a completed one.
Can I object to a wind or solar farm near me?
Yes. Renewable projects go through the same planning process as other development, with a consultation period during which anyone can comment. Larger schemes may be decided nationally rather than by the local authority, which changes who you write to but not your right to comment.
Why are some projects missing a capacity figure?
The source leaves capacity blank for some entries, usually at early application stages before the design is settled. Those are kept as unknown rather than being filled in with a guess or treated as zero.
Related reading

Written by
Rob Gibbs
Hi, I'm Rob, and I run Energy-Review.co.uk. I initially started this project in 2018 when I was looking to switch energy suppliers and found there wasn't a website that provided simple, data-backed reviews on all the suppliers available. Since then, I have spent a lot of time (too much, some may say!) looking at all publicly available data about each supplier and writing reviews using this information. These reviews are updated as regularly as possible, and any data is backed up by a source where necessary. I have also started writing guides on various energy-related topics, which hopefully you will find useful. If you find any issues, please use our contact form to let us know.