Skip to main content
Energy Review
Energy data

Live Wind Farm Map — Current Power Plans Across Great Britain

Wind farms shown

How much power each matched wind farm says it plans to supply this half-hour. These are plans, not live meter readings.

Loading live data
Mapped sites
65
Electricity records matched
71
Total mapped capacity
5,751.2 MW
Sites with a current plan
0 of 65
Contains OS data © Crown copyright and database right 2026

Choose a wind site

Larger circles mean higher-capacity wind farms. Green means a current plan is available, amber means the grid operator has asked the wind farm to change it, and grey means live information is unavailable.

Select a name here or choose a marker on the map. The site’s current plan and supporting grid information will appear in this panel.

Contains BMRS data © Elexon Limited copyright and database right. Site records contain public sector information licensed under the Open Government Licence v3.0.

What the planned power figure means

The figure shows how much power a wind farm said it planned to supply during the current half-hour. Elexon calls this its declared position. It is a plan sent to the electricity system, not measured output from a live meter.

Britain’s grid operator can ask a wind farm to change that plan to help balance supply and demand. Where that happens, the panel shows the revised amount separately. If any linked record is missing from the response, the whole-site figure is marked unknown rather than quietly replacing the missing amount with zero.

Why the map does not show every wind farm

This is a checked set of links between different official records, not a search for every turbine. Official records often use different site names, so the map includes only wind farms that could be matched confidently and located accurately.

Frequently asked questions

Does the planned power figure show a wind farm’s actual output?

No. It shows how much power the wind farm said it planned to supply during the current half-hour. Elexon calls this its declared position. It is not a meter reading. If the grid operator asks the wind farm to change its plan, the revised amount is shown separately.

Why is a wind farm missing from the map?

A site appears only after its government record has been matched to its current Elexon electricity-market records and that link has been checked by a person. Smaller sites may not appear in Elexon’s market data, some government records lack usable coordinates, and uncertain matches are deliberately withheld.

Why does a site show “unknown” rather than zero?

Zero is a real power plan. Unknown means one or more linked grid records did not have a usable current plan, or the relevant Elexon feed was unavailable. Treating missing information as zero would understate the wind farm.

Related reading

Rob Gibbs

Written by

Rob Gibbs

Hi, I'm Rob, and I run Energy-Review.co.uk. I initially started this project in 2018 when I was looking to switch energy suppliers and found there wasn't a website that provided simple, data-backed reviews on all the suppliers available. Since then, I have spent a lot of time (too much, some may say!) looking at all publicly available data about each supplier and writing reviews using this information. These reviews are updated as regularly as possible, and any data is backed up by a source where necessary. I have also started writing guides on various energy-related topics, which hopefully you will find useful. If you find any issues, please use our contact form to let us know.